Skip to content

Raise ruby/spec floor to 19915 after wave-20 conformance work - #598

Merged
tannevaled merged 1 commit into
mainfrom
chore/floor-wave20
Sep 8, 2026
Merged

tannevaled merged 1 commit into
mainfrom
chore/floor-wave20

Conversation

@tannevaled

Copy link
Copy Markdown
Contributor

Consolidated FLOOR bump after the three wave-20 conformance PRs merged (#596 io, #597 enumerator, #595 module).

Measured total on merged main: 19915 passing (was 19773 after wave-19), +142 (io +62, enumerator +49, module +19, plus compounding and the produce_spec hang fix letting one more file load — 2172 loaded / 34 failed).

Local measure at TIMEOUT=25; CI ratchet runs TIMEOUT=60, so the CI total is ≥ this floor.

🤖 Generated with Claude Code

Wave-20 merged three bibliography-first conformance PRs:
- #596 core/io: File.open/new trailing-Hash options, IO#read/readchar/gets
  external->internal transcoding, IO#set_encoding_by_bom, BOM stripping — +62
  (and core/file +8 incidental).
- #597 core/enumerator: Enumerator::Product class, Chain/ArithmeticSequence
  constructors, Enumerator#take_while break-early (clearing the produce_spec
  hang) — +49.
- #595 core/module: extend_object, const_source_location, const_set const_added
  + redefinition warning, class_variable ancestry search, Module.constants
  singleton, remove/undef_method hooks — +19.

Measured total on merged main: 19915 passing (2172 files load, +1 that was a
hang). Local measure at TIMEOUT=25; CI runs TIMEOUT=60 so its total is >= this floor.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
@tannevaled
tannevaled merged commit 94c8a1e into main Sep 8, 2026
7 checks passed
@tannevaled
tannevaled deleted the chore/floor-wave20 branch September 8, 2026 13:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant