Skip to content

Sync upstream 0.42.24 into v3 performance integration - #87

Merged
Ivanbeethoven merged 1 commit into
maint/mst2-native-head-with-projectionfrom
main
Oct 7, 2026
Merged

Ivanbeethoven merged 1 commit into
maint/mst2-native-head-with-projectionfrom
main

Conversation

@Ivanbeethoven

Copy link
Copy Markdown
Collaborator

Integrate the accepted upstream 0.42.24 commit through 79be48d into the v3 performance branch. The six upstream paths and 155 performance paths do not overlap; every accepted upstream and performance blob is preserved in the union. Relative to latest main, this task still changes source, necessary tests and workflows only. Upstream documents, version files and the opt-in example are inherited verbatim.

Validation: independent complete union-tree, ordered-parent and patch reconstruction review; actual union checkout nightly format, diff and locked offline metadata checks passed. Native tests remain pending, and no benchmark is dispatched or performance result claimed. Merge using a merge commit to preserve real main ancestry. Verify the new merge's own GitHub signature, exact tree and both parents; accepted main retains its original historical unknown-key signature status.

Signed-off-by: Eli Ma <eli@patch.sh>
@Ivanbeethoven
Ivanbeethoven merged commit c205114 into maint/mst2-native-head-with-projection Oct 7, 2026
0 of 2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants