Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
26 changes: 23 additions & 3 deletions docs/release-0.5.0-checklist.md
Original file line number Diff line number Diff line change
Expand Up @@ -16,7 +16,18 @@ historical issue number.
benchmark, package, and provenance checks.
4. Rehearse the reviewed artifact through the protected TestPyPI environment.
Install exactly `base-cli==0.5.0` from a new environment and run lifecycle/JSON
smoke checks; retain the artifact digest and workflow URL.
smoke checks; retain the artifact digest and workflow URL. Using that exact
candidate wheel, check out the pinned `base-cli-demo` revision and install
it with `python -m pip install --no-deps .` so dependency resolution cannot
replace the candidate with an older published framework. Verify that
`importlib.metadata.version("base-cli")` is exactly `0.5.0`, run
`python -m pip check`, and then run the demo's documented validation suite,
including optional integration scenarios when their declared extras are
installed. If the pinned demo still declares a pre-0.5 dependency window,
record that compatibility mismatch and the required #47 update as an
explicit deferral; do not accept a run against 0.4.x. Record the demo
commit, candidate digest, and result on the active release-tracking issue.
A demo failure must block completion or be explicitly deferred there.
5. After the release PR is merged, create annotated `v0.5.0` on the independently
approved protected-main commit. Never alter `v0.4.3` or its distributions.
6. Approve the protected production environment. Publish the exact reviewed
Expand All @@ -25,8 +36,17 @@ historical issue number.
7. Verify a clean installation of exactly `base-cli==0.5.0` from PyPI. Record the
immutable tag and GitHub release URLs, PyPI result, checksums, SPDX SBOM,
provenance and SBOM attestations, RELEASE-BOM-ROW, and downstream evidence
on the active release-tracking issue. Close that issue only after every
required artifact and compatibility result has been independently verified.
on the active release-tracking issue. Keep that issue open until the
post-publication consumer step below and every required artifact and
compatibility result have been independently verified.

8. Complete the post-publication consumer step tracked by
[`base-cli-demo#47`](https://github.com/basefoundry/base-cli-demo/issues/47):
update the demo dependency window, lockfile, compatibility/release
workflows, README, and docs for `base-cli>=0.5.0,<0.6`, then run the demo
suite against the published PyPI package. Do not call the 0.5.0 release
train complete until that consumer validation is green or the active
release-tracking issue records an explicit deferral and owner.

Merged release preparation is not publication completion: the release is not
complete while the tag, GitHub release, PyPI package, or required evidence is
Expand Down
Loading