You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Write and review the design for cutting Trusted Server over to EdgeZero PR 275, and record the requirements Trusted Server handed to EdgeZero for that PR. The design covers every outbound call site, Fastly on EdgeZero's canonical lifecycle, redirects through EdgeZero, configuration, consent and privacy, failure handling, rollout and qualification, tests, and the commit sequence #1507 follows.
Done when
The requirements doc and the cutover design are merged under docs/superpowers/specs/.
The design ends in a review log of two or more agent review rounds, the last with nothing blocking.
Maintainers have answered the design's open questions (merge gate, timeouts, hosted qualification, HTTP/3, in-flight pull requests, loopback bidder endpoints), and the design records the answers.
Activity