You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Deliver the reviewed additional bidder protocols and bindings #115
Complete every frozen family sub-issue through automatic discovery and bidder-owned request/response modules, metadata/provenance, parameters, fixtures and local conformance; imported metadata is not implementation.
Preserve runtime activation/safety vetoes and scoped failure behavior. Qualify new reachable schema/engine features and resources before affected promotion rather than borrowing a zero-cost placeholder.
Use native blocked-by/blocking links for unconditional issue relationships. Conditional target gates are not universal blockers; link only the selected applicable path after its contract is frozen.
Shared Acceptance Requirements
Every implementation issue ships its own unit/conformance, failure, resource and privacy tests. A later integration issue does not postpone those checks. New untrusted decoders include generated hostile-input controls; changed hot paths include repeatable measurements. Use the existing engine, host services, validated config/push path and EdgeZero handler registration. Preserve privacy, authorization, cookie integrity, HTTPS/SSRF protections, deadlines, exact sent coverage, authoritative bidder/alias attribution and bounded work/storage. Standalone and embedded behavior share policy rather than fork implementations.
No issue may claim a missing capability from metadata import, compilation, observed allocations, a signed cookie, or a different artifact's old evidence. New public/configuration behavior requires its reviewed design before execution. No workload reduction, raised ceiling or replacement budget equation is implied. Bodies and evidence must not publish credentials, identifiers, raw consent, private provider addresses or customer configuration.
Technical Ownership
Sources: roadmap section 3 and the M7 bidder ownership/import/onboarding contracts.
Activity