Linux E2E previously waited for the complete API operating-system matrix. Split the required API caller into independent Linux and Windows calls so E2E starts after Linux API while full Windows qualification continues. Both complete test commands, artifacts and policy check labels remain; Windows stays unconditional and required before merge. Unknown or unset reusable-workflow platform input runs both operating systems.

The staging transformer recognizes the legacy and split layouts and rejects disabled or misrouted Windows callers. Existing E2E prerequisites remain. The continuation operations, validation, STATUS and master-plan documents now distinguish deployed staging/observation from reference admission and production reuse, record the verified results, and give the next integration sequence. Known admission-contract, inventory-completeness, replay and recall gaps remain tracked on #2336; policy stays shadow and admission has no required-check authority.

Validation:

  • Node 24.13.1/Windows cumulative control suite: 512 passed, zero failures/skips/cancellations, including after integration with product main and the linked-verifier correction.
  • Documentation governance and 686-file link check pass. Independent feature and scoped documentation reviews found no remaining blockers. Original action-pin validation passed 161/161 references.
  • Original scheduling head 8b3f443 passed full required run 34431587587: 18 jobs, 21m54 elapsed, 4,779 runner-seconds. Logs prove E2E starts after Linux API and overlaps Windows API, with both original labels retained. Samples are unmatched; this is schedule proof, not a causal savings estimate.
  • Deployed metadata observer run 34442587802 and the separately tested 306-test portable kit are recorded as distinct evidence scopes. Neither proves execution provenance or production reuse.

Refs #2332, #2336. Exact-head hosted qualification against the final main base remains required before merge. No selection, proof reuse, trigger, permission, branch-protection or runner changes. Rollback removes the Windows caller and Linux platform input together, restoring the reusable workflow's complete default matrix.

@chatgpt-codex-connector

chatgpt-codex-connector Bot commented Sep 10, 2026

Copy link
Copy Markdown

Codex Review Summary

This comment shows the latest Codex review activity on this pull request.

Review Status Commit Review trigger
📝 Code Review Completed 2026-09-10T10:27:04.237521Z 96e0771 New commits
ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review" or "@codex security review".

Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings.

@Chris0Jeky Chris0Jeky moved this from Pending to Review in Taskdeck Execution Sep 10, 2026
@Chris0Jeky

Copy link
Copy Markdown
Owner Author

Independent feature review complete at 8b3f443: SHIP, no direct correctness/coverage blocker. Both full unfiltered API suites remain required by the ci-required workflow merge contract, with OS-specific artifacts and separate hosted workspaces. Expected check labels are preserved in the caller/inner names and canonical policy; actual hosted emitted labels and timing still need confirmation.

Reviewer ran 9 focused API/E2E/topology tests, 683-file link check and diff whitespace validation. Coordinator ran 511/511 control tests, docs governance, link check and 161/161 Action pin check. No tests were dropped, no new proof-reuse/selection authority introduced.

Round 1 complete. Keep parent-first order; exact-head/current-base hosted qualification and three-minute age remain required. Project Priority II/Review synchronized from Refs #2332/#2336.

@chatgpt-codex-connector chatgpt-codex-connector Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

💡 Codex Review

Here are some automated review suggestions for this pull request.

Reviewed commit: 8b3f443288

ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review".

If Codex has suggestions, it will comment; otherwise it will react with 👍.

Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".

Comment thread scripts/ci/smart-ci/continuation/tools/stage-taskdeck.mjs
@Chris0Jeky

Copy link
Copy Markdown
Owner Author

Hosted scheduling observation at head8b3f4432880559807ad3a909207b38aafb81a19f: actual checks are still API Integration / API Integration (ubuntu-latest) and API Integration / API Integration (windows-latest). Both started03:00:22UTC; Linux completed successfully03:08:10, E2E started03:08:23 while Windows API remained in_progress. This directly verifies the intended overlap and retained check labels. The run is still pending; no completed-run savings or merge-readiness claim yet.

@Chris0Jeky

Copy link
Copy Markdown
Owner Author

Completed hosted measurement for #2878

Required CI run34431587587 at head8b3f4432880559807ad3a909207b38aafb81a19f succeeded. All18 measured jobs completed; aggregate runner time4,779seconds; first job start to final completion1,314seconds (21m54s).

Exact retained check results: Linux API468s, Windows API1,275s, E2E548s. Linux finished03:08:10UTC; E2E started03:08:23 and finished03:17:31; Windows finished03:21:37. E2E therefore completed before Windows, confirming the removed serialization while all suites passed.

Earlier staged original-head run34423790319 used4,651runner-seconds and1,772seconds elapsed (29m32s). This run is7m38s shorter elapsed but128runner-seconds higher. These are different hosted samples, not a controlled causal estimate or a compute-savings claim. The directly proven result is retained coverage/check names and actual platform overlap. Both runs have one successful attempt; source/metadata/configured Node identity is retained in the read-only observation reports.

The current PR is fully green on its stacked base. Parent-first retarget/current-base qualification remains before merge. No production evidence reuse or selection activation.

Base automatically changed from ci/continuation-07-portable to main September 10, 2026 10:23
@Chris0Jeky

Copy link
Copy Markdown
Owner Author

Final refresh: #2871 merged as2d50256be7be980f7cb8e8230d12ff44093987da after corrected required run34462829280 passed. This PR is retargeted to main and pushed as96e07710f1835bc226fb441f4e9a312c28d3d05a. The scheduling workflow/transformer/regression files are byte-identical to independently reviewed8b3f44328; all additional changes are the reviewed evidence/state documentation. The corrected verifier is already in the base. Current integrated control512 and docs governance/686links pass; complete full required CI is now requalifying this final head. No linked closing issues were introduced by the rewritten body. Current policy remains shadow, all original full suites remain required, and no production reuse is enabled.

@Chris0Jeky
Chris0Jeky merged commit f667ae1 into main Sep 10, 2026
36 checks passed
@Chris0Jeky
Chris0Jeky deleted the codex/2332-linux-e2e-prerequisites branch September 10, 2026 10:57
@github-project-automation github-project-automation Bot moved this from Review to Done in Taskdeck Execution Sep 10, 2026
@Chris0Jeky

Copy link
Copy Markdown
Owner Author

Completed the continuation train: #2863, #2864, #2865, #2867, #2868, #2869, #2871 and #2878 are merged. Final merge f667ae1 contains final head96e07710f1835bc226fb441f4e9a312c28d3d05a. Each PR received current-base full required qualification; all eight project items are Done with populated priorities, and the post-merge checkpoint has zero unresolved review threads.

Final required run34465851361 passed18jobs in one attempt:5,500runner-seconds and1,872seconds first-job-to-last-completion (31m12s). Linux API completed10:32:55UTC, E2E started10:32:58 and completed10:43:42, Windows API completed10:55:15. Both original full API labels/suites remain, and overlap is directly proven. This sample is slower than the earlier21m54 sample; neither is a causal speedup or compute-savings estimate. Windows duration variability remains a measurement/diagnostic priority, not a presumed flaky test. No cancellation or retry was needed for the final run.

Local cumulative control512passed; the corrected portability head's control510 and seven export tests passed; the regenerated standalone kit separately passed306 (overlapping scopes). The owner-authorized linked-entry verifier fix has independent SHIP review. The r2 kit source iscdc6d8e9fa801d0b90d152935e14c540dba6c835;27payloadfiles verified before ZIP creation and after extraction. The old verifier/archive are superseded.

Production selection/reuse remains disabled/shadow. Before activation: complete the tracked producer-contract/inventory/exposure gaps, prove protected execution for one whole-task family, extend the existing canonical gate receipt, connect authenticated landed/full-audit events, and qualify failure recall. The current recall report is not ready. The merged operations guide records the sequence and a recommendation to avoid repeatedly qualifying tightly coupled CI-control stacks. SC-4, SC-6 and SC-7 remain in OUTSTANDING_TASKS; no settings/runner/issuer activation is implied.

Chris0Jeky added a commit that referenced this pull request Sep 10, 2026
Fresh-context review of this PR found I had searched the wrong issue.
The continuation train's tracker is CI-12 #2336, not #2337 or #2324, and
#2336 records the session as maintainer-requested and, at 02:40:20Z on
2026-09-10, "the maintainer's 2026-09-10 request to finish
implementation, merging, testing and CI improvements". So "no delegation
is recorded" was wrong. The row now asks whether that request supplied
the per-PR review the amendment wants, and infers nothing either way.

Three further corrections the same review prompted:

The divergence did not start 2026-09-09. J.1 (#2772) and J.2 (#2787) are
both 2026-09-08, and 2026-09-09 is the day the rule was honoured, with
the four-PR delegation. The pointer file said the opposite.

The row omitted the train's quality record, which changes how question
(a) reads. Every PR carried a Codex and an independent review with
current-base full required qualification. One confirmed HIGH, a trusted
verifier bypassed through a Windows directory junction, was refused at
09:44Z, fixed in cdc6d8e at 09:49:14Z and is an ancestor of #2871's
10:23:22Z merge; export.test.mjs passes 7/7 on current main. The gap is
procedural, not a shipped known defect. #2878 is added: it is the eighth
merge in the same train.

#2868's ci-continuation-observe.yml and #2791's nightly observer are
different PRs under different trackers, and #2791 was delegated on
2026-09-09. An unqualified ruling about "the observer" would hit the
wrong one, so the row says which is which.

Also: name J.2 as where a parked control-plane PR is recorded now that
SC-10 is closed; stop hard-coding live connector status in a file whose
own preamble says live GitHub outranks it, and restore the standing
"a usage-limit notice is informational, not a finding" triage line;
correct the CF subset sentence, which spans v0.4 as well; bump
Last reviewed.

Refs #2337, #2336.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Status: Done

Development

Successfully merging this pull request may close these issues.

1 participant