Skip to content

[BUG] ADO pipeline cancelled the Azure load testing task but in background it is running. #7

Description

Describe the bug
I created ADO pipeline for load test execution via ALT (Azure Load Testing). I have private repo so ADO provides default execution time for pipeline is 60 mins. I have configured 1 hour load test via ADO pipeline. After 1 hour ALT job got cancelled via ADO but in background ALT was running the load test.

Expected behavior
Ideally when ADO cancelled the load test task, azure load testing should stop test execution.

Screenshots
Azure load testing task cancelled after 49 mins 34 seconds as per below snapshot
image

ALT ran test for 1 hour 6 mins 40 seconds i.e. 4000 seconds
image

Note - jmx has test run duration - 4000 seconds

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions