Repository navigation
runtime-node: keep the SDK's promise from instrumented LLM calls - #63
Open
kunalgoesbyken wants to merge 1 commit into
Open
kunalgoesbyken wants to merge 1 commit into
kunalgoesbyken wants to merge 1 commit into
Autter.dev / Autter product walk
completed
Nov 21, 2026 in 1s
No walk on this PR: the plan's PR review limit is reached
Autter didn't walk this commit: the plan's PR review limit is reached.
A neutral check never stops a merge. Autter sets this check on every pull request it reviews. It fails only in Live mode, and only when the walk's replays repeat a regression. Measure mode, the default, never fails it.
Loading