Skip to content

Latest commit

 

History

History
26 lines (22 loc) · 1.85 KB

README.md

File metadata and controls

26 lines (22 loc) · 1.85 KB

RFCs

Changes to Pullboard's standard doctrine, and other changes that affect every repo using Pullboard, are proposed as RFCs.

An RFC is one file here, numbered next: what changes, why, what it costs, and who it affects. Propose it in a pull request. Discussion stays open at least 14 days, then the maintainers accept or decline it and record why in the file.

An RFC records a decision. Accepted means decided, not built; the CHANGELOG says what each release built. A later change to a decided RFC is a dated amendment.

RFC Title Status
0001 A standard doctrine, version 1 accepted
0002 The relay and API v1 accepted
0003 Procedures, resources and proposals accepted
0004 An encrypted relay, and what it keeps accepted
0005 Commit messages carry their item and rows accepted
0006 Cells, the structure of a codebase many agents build at once accepted
0007 Sealed cells and proof that travels accepted
0008 Durable jobs and the runner protocol proposed
0009 Contribution records proposed
0010 Releases: Cut. Clear. Ship. proposed
0011 Proof on the exact tree approved (narrowed)
0012 Compiled bars proposed
0013 The clock proposed
0014 Declared capacity proposed
0015 A lean record proposed
0016 Recursive governance proposed; blocked on RFC 0012