Beatbox Assembly Tutorials

Follow these guides in numerical order to build the enclosure and its sub-modules.

Assembly sequence

Step Tutorial What to complete
1 Frame and enclosure assembly Build the base, pillars, walls, and door. Leave module installation and the top-panel closure until Steps 2–6 are complete.
2 Water bottle mount Build and prepare the water bottle mount for attachment to the enclosure.
3 Feeder module Build the feeder housing, electronics, motor, and rotor.
4 Light ring module Build the light ring housing, PCB, cap, and diffuser.
5 Photobeam gate Build the photobeam gate, IR boards, controller, cabling, and covers.
6 Screen module Build both touchscreen housings, controller PCBs, IR boards, and cabling.
7 Final enclosure integration Install the completed modules, position the photobeam gate, complete the final checks, and secure the top panel.

Steps 1 and 7 use the same enclosure guide: Step 1 prepares the structure, and Step 7 completes the integration after all sub-modules are ready.

For parts and quantities, see the bill of materials.