Skip to content

Latest commit

 

History

History
23 lines (18 loc) · 1.49 KB

File metadata and controls

23 lines (18 loc) · 1.49 KB

Architecture decision records

ADRs capture durable choices and the evidence that could reverse them. Accepted means the direction is settled for current planning. It does not bypass the research and implementation gates.

ADR Decision Status
0001 Trail owns outcome and commitment coordination Accepted
0002 accepted event journal with rebuildable projections Proposed
0003 selective home-authority federation without global consensus Accepted
0004 human-agent participation is dynamic and stage-specific Accepted
0005 begin as a modular monolith Proposed
0006 validate core semantics in a bounded in-memory reference kernel Accepted
0007 Trail is independently deployed under the GraycodeAI product family Accepted

ADR lifecycle

  • Proposed: under research or waiting for a gate.
  • Accepted: current decision; implementation and docs align to it.
  • Superseded: replaced by another ADR, with history preserved.
  • Rejected: considered and deliberately not chosen.
  • Deprecated: still present for compatibility but not for new use.

An ADR includes reconsideration triggers so evidence can change the choice without rewriting history.