Work plan: #720 and the SFTP backend done; #677 and SSH-folder trees in progress
Work plan: #767 a2b and #739 d done; #697 and SFTP in progress
Work plan: 9.4.7 released (rows dropped); #767 a2a and #698 done; DeepSeek on #720 #739d #743
Work plan: #767 a1 done, a2 next; 9.4.7 tagged
Work plan: #739 a+b done, #767 started
Work plan: time stamp
Work plan: #742 done
Work plan: correct the time stamp
Work plan: 9.4.7 prep, agents on #739/#720/#698/#743, #767 planned
Work plan: #683, #716 done
Work plan: #737/#753 done; #683, #716 in progress
Work plan: #710 stage 3 merged; #737/#753 in progress
Work plan: #765 queued
Work plan: #745 #746 #747 done; #710 s3 and #679 in progress
Work plan / To test: #710 stage 2 merged, #746 started
To test: recipes row matches the build
To test: recipes, ORCA MO table re-parse
Work plan: #719 fixed, #710 stage 1 merged, IRC examples with orbitals
Work plan: tickets for the two-machine test, lab set-ups and the box editor; #394 scope; recipes status
Work plan: time
Work plan: #719 checker and #722 done; ORCA MO parser fix planned
Work plan: correct time
Work plan: unreleased work only (done since 9.4.6, in progress, planned); #759 done; #719/#722 started
Work plan: done / in progress / planned as tables with the intended release; 9.4.6 released
Work plan: #700, #713
Work plan: ecce-terminate (#695)
Work plan: #711
Work plan: #691 on main and for 9.4.6
Work plan: current 9.5.0 state, after-9.5.0 list replaces the 9.4.0 one, HDF5 converters #690, CREST in codes planned
Work plan: 9.4.5 released, HiDPI next, #689; To-test: #689